The Construction Process

It’s time to build your Pacific Pool! Each phase of construction will be fascinating as we bring the Pacific to your backyard! Following is an outline of what the journey will entail:

Layout

An experienced project manager will visit your yard in preparation for excavating the pool. He will use a laser level to calculate elevations and check critical measurements. This will ensure that the pool is placed correctly and that proper drainage is accounted for. Next, the shape of your pool will be outlined on the ground with spray paint and forms will be set for the excavator to use when digging the pool. The location of the pool equipment will also be marked.

Excavation

This is an exciting day for many homeowners because they can see their new pool taking shape for the first time. A dump truck and a tractor will arrive to dig the pool. Believe it or not, we can drive our smallest tractor through a typical four-foot gate! In most cases, we can excavate your pool in just one day.

Plumbing

All of the lines for your filtration system, cleaning system, spa and water features will be installed using only the highest quality “Schedule 40” PVC pipe and then we hydrostatically pressure test it to ensure that there are no leaks.

Steel Reinforcement

Pacific Pools engineers our pools to guarantee structural integrity and quality. During the steel phase, we will install the ideal skeletal structure for your pool based on load weights generated by the design and depth of your pool. Block spacers and tie wires will hold the steel approximately three inches above the soil to place the steel curtain in the middle of the pool’s concrete shell and maximize the strength of the pool shell.

Electrical

A 6- to 12-inch-deep trench leading from your existing electric panel to the pool equipment area will provide a space to install the proper wiring. A copper ground wire will be used to ground any metal fences, wrought iron, motors, metal window frames or any other metal within five feet of water’s edge. Pacific Pools and Spas takes extra steps to insure your safety.

Municipality Inspections

In most cases, this is the time for your first city inspection. The inspector will ensure that any applicable local, national or international codes are met. Once the pool passes the inspection, a “green tag” or written authorization to continue construction will be issued.

Shotcrete

Pacific Pools will apply or “shoot” the concrete shell of your swimming pool. We use pneumatically applied shotcrete to ensure the highest tensile strength and longevity. Our truck or “rig” will pump the shotcrete through a large hose, which our expert craftsman will use to apply the material. The thickness of your shotcrete will be determined by our engineered plans and is designed to withstand a lifetime of use.

Water Features and Hardscapes

It’s time to add the fun stuff! If you’ve added a rock waterfall or other water feature, it will be installed at this stage. If you’re adding fire pits, barbecues, masonry benches, bee hives or other “Hardscapes” items to your outdoor living space, these will be installed prior to the deck phase.


At this time also, we will ensure that gas lines, landscape lighting and landscape feed lines or sleeves are finished. Our team can coordinate efforts with your landscaper before the deck is formed and poured.

Deck and Tile

You’re almost there! In most cases, the deck will be formed and poured before the waterline tile is installed, although in some cases, tile may be installed first. If you’ve invested in Pacific Deck, we will install the surface after the concrete cures. 

Cleanup

A crew will be on site to clean up all of the construction debris and fill in the trenches created during the process of building your new Pacific Pool.

Final Municipality Inspections

Before we finish the interior surface, a final inspection by the city will take place to make sure all of the barriers comply with code. The inspector will notify Pacific Pools of this date. 

Interior Finish

The day has finally arrived when Pacific Pools’ interior crew begins to apply your interior surface. If you have chosen a plaster product, this takes only a few short hours and then water will begin flowing! If you chose a Pebble surface, we will fill your pool the next day.

Pool Start-up and Orientation

After the pool interior is completed, we’ll perform a mechanical startup to get the equipment running and the water flowing. We will also label valves and make the necessary adjustments to ensure the proper operation of your equipment.

Once the startup equipment is installed and running, a Pacific Pools and Spas representative will provide a thorough and professional orientation on the proper use, care and maintenance of your equipment. Proper care will result in many years of trouble-free enjoyment.

You are now ready to enjoy your pool—and Pacific Pools has had the pleasure of bringing the Pacific to another backyard!

LINKS TO: Fulton Homes |  Palacia Homes |  Paramount |  Ultra Poz |  New Sun Homes

Home |  About Us |  Getting Started |  Photo Gallery |  FAQ's |  Contact Us |  Company History |  Customer Testimonials |  Our Homebuilder Relationships
Our Products |  Remodeling Division |  Commercial Division |    Choosing a Pool Builder
  The Sales and Design Process |    The Engineering and Permitting Process |    The Construction Process |    Locations and Maps
  Your Team |    Employment Opportunities |    Customer Care |    Site Map
Copyright©2008 Pacific Pools and Spas. All rights reserved.
Website Development By: Lifestyles Media Group

Administration